VT Energy OS / Door 3: Optimize, Trade & Balance
✕ Hub
🔋 Zero Trading License BTM Storage • April 2026 Solar-vs-Grid BESS Metering • 36 Days to Jan 1, 2027 ALMM List-II Mandate
Tab 3A • License-Free Behind-the-Meter LFP Storage (35,040 Annual 15-Min Blocks)

Shave +20% Evening ToD Peaks & 15-Min MD Spikes—With Zero Upfront CapEx Option

Installed behind your existing HT meter (only CEA/CEIG anti-islanding approval needed)—controlled locally via VulaTrace Modbus/MQTT Edge EMS.

Pull Real 15-Min Curve via IES OTP →
24-Hr Automated Edge EMS Dispatch Twin Offline Modbus/MQTT Failover Active
00:00 – 06:00
Off-Peak Top-Up
Optional grid reserve (Quarantined)
09:30 – 16:00
Solar Charge ↑
Absorbs unbanked midday solar
17:00 – 23:00
ToD Peak Shave ↓
Eliminates +20% DISCOM peak
24x7 Real-Time
15-Min MD Clip
Shaves 650 kVA demand spikes
ToD Peak Shift₹93.14 L/yr
MD Spike Shaving₹46.80 L/yr
Diesel Replaced₹8.10 L/yr
Gross Bill Drop₹148.04 L/yr
April 2026 Captive Meter Split: 1.11 MU/yr Solar-Charged (51% Eligible) 0.14 MU/yr Grid-Charged Auto-Quarantined
Zero-CapEx BESS-as-a-Service (BaaS) Day-1 Cash Positive
Monthly Bill Drop₹12.34 Lakh/mo
Fixed BaaS Lease Fee₹9.60 Lakh/mo
Client Day-1 Net Cash Gain (₹0 CapEx): +₹32.84 Lakh / yr
Alternative: 100% Client CapEx 40% Accelerated Dep. Eligible
Turnkey LFP BESS + Edge EMS Kit₹7.80 Cr + ₹2.40L
Simple Pre-Tax Payback5.3 Years (~4.7 Yrs Post-Tax)