Upload Multi-State Power Bills or Fetch Smart Meters
Un-gated CFO diagnostic in under 60 seconds—comparing Group Captive FDRE, BTM Storage, OPEX & CERC OTC VPPAs.
Drop 1 to 1,500+ Monthly HT/LT Electricity Bills Across Any Indian State
Accepts PDFs, scanned images, CSV/Excel meter exports, or a single .zip archive • Supports MSEDCL, GUVNL, BESCOM, TANGEDCO, Tata Power, Torrent + 22 DISCOMs.
Data Pulled: 12-month billing ledger + 35,040 annual 15-minute smart-meter intervals per site.
Purpose: Deterministic tariff leak audit, BTM battery sizing & SPV/VPPA financial structuring only.
Governance: Read-only fetch • Auto-expires in 30 days • 1-click revocable anytime.
Stage 1/5: Normalizing Multi-State DISCOM Bills & Load Curves...
Current Spend: ₹39.48 Cr/yr (₹9.40/kWh) — ₹5.25 Cr/yr (13.3%) in Avoidable Tariff Penalties
KA-04 (LT): Fix Power Factor First (₹3L capacitor saves ₹4.8L/yr — excluded from solar CapEx).
100% State DISCOM Grid + Diesel Backup
16.0 MWp Group Captive FDRE + 6.5 MWh BTM BESS (15 HT) + OTC VPPA (3 Leased)
Third-Party OPEX RESCO + BESS-as-a-Service + OTC VPPA
10:00–16:00 (Solar Surplus): Charges LFP racks at ₹0 marginal banking loss (segregated as Solar-Eligible kWh).
17:00–23:00 (+20% ToD Peak): Discharges behind HT meter to clip 15-min MD spikes & avoid ₹26/kWh diesel backup.
Fixed Strike ₹4.10/kWh vs. P50 IEX ₹4.65/kWh: Generates +₹0.55/kWh positive CfD rebate while retiring non-tradable Grid-India RECs for 100% Scope 2 BRSR Core compliance.
Unlock Full Site-by-Site CFO Structuring Memo & Editable Excel Model
Includes SERC tariff clause citations, 74:26 SPV shareholding chart, Ind AS VPPA accounting note, and anonymized match to Door 2 parks & Door 4 lenders.